Well going in. Ended up being 160 feet down. I was told by the well driller that it was one of the stronger wells he had drilled in the area, 45-50 gallons a minute.
The well was tied into the house, new pressure tank and piping.
The septic is in. We had to use a holding tank since the ground will not perk.
Carpet is in all the bedrooms.
We tiled the rest of the rooms since there is in-floor heat.
The light fixtures and rest of the electrical is all in.
The railings are up. They are log with rebar...I'm very happy with the look.
Bathroom fixtures are all in and in working order.
Utility closet is together with the stackable washer and dryer.
Entry area has the bench in it. I still have to build a shelf and a rack of pegs for hanging coats and stuff on.