Digging out the grade beam around the slab.
Plastic vapor barrier down and placing down Styrofoam.
Styrofoam prepped.
Pex pipe laid out. I made 2 zones.
I prepped the slab. We paid a contractor to conduct the pour.
Wall lumber has arrived!
Walls starting to go up.
Starting to put up sheeting.
All done and now waiting for the trusses to show up.